Wind Turbines Repowering

We repower the wind farm by operating on the physical components of the system in order to guarantee the full functionality of the wind turbines.

Through our interventions we aim to restore the maximum efficiency of wind turbines, in order to work at full speed with a performance and an energy production comparable to those of a new turbine.

We repower the wind farm by operating on the physical components of the system in order to guarantee the full functionality of the wind turbines.

Through our interventions we aim to restore the maximum efficiency of wind turbines, in order to work at full speed with a performance and an energy production comparable to those of a new turbine.

Wind turbines can be subjected to the repowering process in case of:

  • blade delamination
  • punctures
  • debonding
  • microcracks
  • surface deterioration
  • damage to the lightning protection system
  • any other types of damages

Wind Turbines Repowering Process

  1. Inspection of turbines to detect damages
  2. Component repair
  3. Installation
  4. Testing
  5. Issue of certification and guarantee of correct functioning

What does the Repowering of Wind Turbines consist of?

  • Thorough cleaning of all external components, with application of resins, anti-corrosion and anti-rust products and subsequent painting
  • Repair of any cracks
  • Replacement of obsolete electric generator
  • Replacement of brakes, bearings, hoses, seals, springs and hooks
  • Introduction of new, high quality and avant-garde switchboards
  • Replacement of the original control system with our SCADA software
  • Testing and installation of the turbine
  • Issue of the certifications required by the GSE (the Italian Energy Services Manager)
  • Thorough cleaning of all external components, with application of resins, anti-corrosion and anti-rust products and subsequent painting
  • Repair of any cracks
  • Replacement of obsolete electric generator
  • Replacement of brakes, bearings, hoses, seals, springs and hooks
  • Introduction of new, high quality and avant-garde switchboards
  • Replacement of the original control system with our SCADA software
  • Testing and installation of the turbine
  • Issue of the certifications required by the GSE (the Italian Energy Services Manager)

Experience and professionalism at your service