Wind Farm Design

We design wind farms by building already tested energy production plants and, therefore, that have the certainty of being approved and supported by financial incentives.

Our wind farm design work combines traditional systems and innovative technologies to reach the most suitable solution, in order to guarantee the safety and efficiency of the installed system, as well as the economic return on the investment.

We design wind farms by building already tested energy production plants and, therefore, that have the certainty of being approved and supported by financial incentives.

Our wind farm design work combines traditional systems and innovative technologies to reach the most suitable solution, in order to guarantee the safety and efficiency of the installed system, as well as the economic return on the investment.

Wind Farm Design Process

  1. Feasibility study
  2. Planning and sizing
  3. Budget business plan with expenses and revenues
  4. Obtaining building and environmental permits from the competent authorities
  5. Construction
  6. Testing
  7. Connection
  8. Commissioning of the plant
  9. Implementation
  10. Submission of results
  11. Periodic checks and maintenance

Sustainable, clean, unlimited and inextinguishable energy – Distributed Generation – Lower operating costs compared to fossil fuels – Low maintenance costs – Possibility to qualify for local and state incentives – Easy dismantling of wind turbines at the end of their lifetime

What does the design of wind farms consist of?

  • Analysis of wind conditions using anemometer
  • Study of topographic and thermodynamic conditions by means of software and specialized services (detection of suitable territories, access to the road, environmental impact, cultural issues…)
  • Type of system to be installed
  • Number of wind turbines
  • Height of the towers
  • Size of the rotors
  • Best placement for plant performance
  • Evaluation of expenses necessary to start the business and forecast of revenues
  • Bureaucratic fulfillment and issue of certifications from the competent bodies
  • Turbine construction
  • Elimination of any interference between generators
  • Verification of the correct functioning of all elements
  • Installation of electrical connections to the energy transmission system
  • Start-up of the plant and communication to the competent authorities
  • Commissioning communicated at least 5 days in advance to verify environmental performance of the plant
  • Maintenance activities during the lifetime of the wind power plant (on average 20/25 years)
  • Analysis of wind conditions using anemometer
  • Study of topographic and thermodynamic conditions by means of software and specialized services (detection of suitable territories, access to the road, environmental impact, cultural issues…)
  • Type of system to be installed
  • Number of wind turbines
  • Height of the towers
  • Size of the rotors
  • Best placement for plant performance
  • Evaluation of expenses necessary to start the business and forecast of revenues
  • Bureaucratic fulfillment and issue of certifications from the competent bodies
  • Turbine construction
  • Elimination of any interference between generators
  • Verification of the correct functioning of all elements
  • Installation of electrical connections to the energy transmission system
  • Start-up of the plant and communication to the competent authorities
  • Commissioning communicated at least 5 days in advance to verify environmental performance of the plant
  • Maintenance activities during the lifetime of the wind power plant (on average 20/25 years)

Experience and professionalism at your service